Manufaktur
Bills of Materials
Bill Of Material Struktur Biaya | 21/11/2024 20:30:18
BP-Enak
Produk | Internal Referensi | Bahan | Jumlah | Biaya Produksi/Product Cost | Biaya BoM |
---|---|---|---|---|---|
Bakpao | BP-Enak | 10 | 60000 | 1093000 | |
Kayu | 2 | 4000 | 4000 | ||
Cat | 3 | 9000 | 9000 | ||
Peci | 9 | 1080000 | 1080000 | ||
Biaya Satuan | 6000 | 1093000 |